Table 4. Construct validity

Estimate S.E β C.R. p
str <- DLP 1 0.857
hr <- DLP 1.065 0.095 0.866 11.251 ***
vs <- DLP 1.077 0.088 0.92 12.308 ***
ts <- DC 1 0.875
ss <- DC 0.897 0.077 0.875 11.661 ***
sz <- DC 0.922 0.08 0.87 11.549 ***
em <- DX 1 0.734
re <- DX 1.285 0.161 0.914 7.959 ***
go <- DX 1.18 0.168 0.729 7.031 ***
op3 <- OP 1 0.843
op2 <- OP 1.187 0.103 0.894 11.547 ***
op1 <- OP 1.049 0.124 0.729 8.432 ***
or3 <- OR 1 0.76
or2 <- OR 1.089 0.13 0.806 8.409 ***
or1 <- OR 1.047 0.112 0.887 9.347 ***
fp3 <- FP 1 0.76
fp2 <- FP 1.27 0.125 0.92 10.138 ***
fp1 <- FP 1.395 0.135 0.935 10.333 ***
op4 <- OP 0.996 0.108 0.774 9.189 ***
fp4 <- FP 1.24 0.127 0.893 9.782 ***
p<0.001.
str=전략수립, hr=스킬함양, vs=비전수립 ts=변환역량, ss=탐색역량, sz=포획역량, op=운영 성과, or=조직상과, fp=재무 성과, DLP=리더십역량, DC=동태적역량